Image from Google Jackets

Dual multi-purpose tower engineered to cut ultra-deepwater well delivery costs

By: Language: Inglés Publication details: abr. 2015Description: 9 p. ; 61-70 In: World Oil 236
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200061288

A number of drilling-the-well-on-paper (DWOP) exercises show increased tripping speeds, reduced fuel consumption by virtue of an integrated ship design, and the built-in efficiencies of the new DMPT, reducing ultra-deepwater well construction time and costs from 20% to 25% per well.

4



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales