Dual multi-purpose tower engineered to cut ultra-deepwater well delivery costs

Wijning, Dieter

Dual multi-purpose tower engineered to cut ultra-deepwater well delivery costs - abr. 2015 - 9 p. ; 61-70

A number of drilling-the-well-on-paper (DWOP) exercises show increased tripping speeds, reduced fuel consumption by virtue of an integrated ship design, and the built-in efficiencies of the new DMPT, reducing ultra-deepwater well construction time and costs from 20% to 25% per well.

4


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales