Dual multi-purpose tower engineered to cut ultra-deepwater well delivery costs (Record no. 189059)

MARC details
000 -LEADER
fixed length control field 00815nab a2200193 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s2015 xxu ing
041 ## - IDIOMA
Idioma Inglés
245 00 - TITULO
Título Dual multi-purpose tower engineered to cut ultra-deepwater well delivery costs
260 ## - PUBLICACION, DISTRIBUCION, ETC
Lugar de publicación, distribución, etc.
Nombre de publicador, distribuidor, etc.
Fecha de publicación, distribución, etc. abr. 2015
270 ## - FECHA DE CARGA
Fecha de carga 24/07/2015 ; 24/07/2015
300 ## - DESCRIPCION FISICA
Otra extensión 9 p. ; 61-70
500 ## - NOTAS
Nota general A number of drilling-the-well-on-paper (DWOP) exercises show increased tripping speeds, reduced fuel consumption by virtue of an integrated ship design, and the built-in efficiencies of the new DMPT, reducing ultra-deepwater well construction time and costs from 20% to 25% per well.
581 ## - ESTADO DE COLECCIÓN
Estado de colección 4
773 0# - CORRECCIÓN
Título World Oil
Partes relacionadas 236
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Artículo de Revista
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Wijning, Dieter
9 (RLIN) 36389
Holdings
Biblioteca propietaria Biblioteca actual Fecha de adquisición Inventario Total de préstamos Inventario Fecha de carga Tipo de item KOHA
Biblioteca Alejandro Angel Bulgheroni Biblioteca Alejandro Angel Bulgheroni 06/03/2026 200061288   200061288 06/03/2026 Artículo de Revista


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales