Operator tests limits of coiled tubing drilling With 1.000 wells to drill, BP set out to prove that coiled tubing drilling (CTD) wasn't a pipe dream
Publication details: marzo. 2007Description: 2 p. ; 37-38 In: E & P 80| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200042762 |
3



