Operator tests limits of coiled tubing drilling With 1.000 wells to drill, BP set out to prove that coiled tubing drilling (CTD) wasn't a pipe dream

Operator tests limits of coiled tubing drilling With 1.000 wells to drill, BP set out to prove that coiled tubing drilling (CTD) wasn't a pipe dream - marzo. 2007 - 2 p. ; 37-38

3


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales