Operator tests limits of coiled tubing drilling With 1.000 wells to drill, BP set out to prove that coiled tubing drilling (CTD) wasn't a pipe dream
Operator tests limits of coiled tubing drilling With 1.000 wells to drill, BP set out to prove that coiled tubing drilling (CTD) wasn't a pipe dream
- marzo. 2007
- 2 p. ; 37-38
3
3



