Image from Google Jackets

LNG technology for stranded gas

By: Publication details: jul. 2010Description: 3 p. ; 12-14 In: Petroleum Review 64Summary: Transcripción del resumen del autor. While much attention has recently focused on the design of floating LNG production (FLNG) vessels, MEO Australia has been working on a different approach for the development of stranded gas. Its scheme would involve the construction of an LNG plant on an offshore platform complex for its Tassie Shoal project. But ultimately, the widespread adoption of either approach depends on finding solutions for the safe transfer of LNG cargo in rough seas. A newly developed single point mooring scheme may provide a solution, but it will require new forms of cryogenic pipelines. Jeff Crook reports.
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200049684

Transcripción del resumen del autor. While much attention has recently focused on the design of floating LNG production (FLNG) vessels, MEO Australia has been working on a different approach for the development of stranded gas. Its scheme would involve the construction of an LNG plant on an offshore platform complex for its Tassie Shoal project. But ultimately, the widespread adoption of either approach depends on finding solutions for the safe transfer of LNG cargo in rough seas. A newly developed single point mooring scheme may provide a solution, but it will require new forms of cryogenic pipelines. Jeff Crook reports.

762



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales