Australia fast-tracking the development of IGCC with CCS
Publication details: sep. 2009Description: 4 p. ; 34-37 In: Power Engineering International 17| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200046990 |
The original objective of Australia’s ZeroGen project was to build a 80 MW net integrated gasification combined-cycle demonstration facility, before scaling up to a 300 MW net facility with carbon capture and storage (CCS) by 2017.
8



