Australia fast-tracking the development of IGCC with CCS
Cribb, J. Cribb, Julian
Australia fast-tracking the development of IGCC with CCS - sep. 2009 - 4 p. ; 34-37
The original objective of Australias ZeroGen project was to build a 80 MW net integrated gasification combined-cycle demonstration facility, before scaling up to a 300 MW net facility with carbon capture and storage (CCS) by 2017.
8
Australia fast-tracking the development of IGCC with CCS - sep. 2009 - 4 p. ; 34-37
The original objective of Australias ZeroGen project was to build a 80 MW net integrated gasification combined-cycle demonstration facility, before scaling up to a 300 MW net facility with carbon capture and storage (CCS) by 2017.
8



