Image from Google Jackets

Coiled tubing becomes the key enabler for successful multilateral well development To develop the mature Pampo Field offshore Brazil, Schlumberger used CT in perforating, logging for cement evaluation, stimulation and stiffline operations

By: Publication details: ene. 2008Description: 7 p. ; 79-87 In: World Oil 229
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200042342

1



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales