Coiled tubing becomes the key enabler for successful multilateral well development To develop the mature Pampo Field offshore Brazil, Schlumberger used CT in perforating, logging for cement evaluation, stimulation and stiffline operations

Trummer, S. Silva, D. Cano, V.

Coiled tubing becomes the key enabler for successful multilateral well development To develop the mature Pampo Field offshore Brazil, Schlumberger used CT in perforating, logging for cement evaluation, stimulation and stiffline operations - ene. 2008 - 7 p. ; 79-87

1


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales