The Sarlus IGCC Project construction overview and commissioning experience

By: Contributor(s): Series: Allevi, Claudio ; Description: 5 pDDC classification:
  • CD W938 1 0013960
In: v. 3, p. 238Summary: Resumen del autor, extraído del trabajo. Sarlux (a joint venture between Saras and ENRON) is developing a new Integrated Gasification Combined Cycle (IGCC) plant designed to produce in an environmentally acceptable manner electric power (551 MWe), steam (180 t/h) and hydrogen (40,000 Nm3/h) using high sulphur refinery residuals (TAR, Vacuum Residue and Asphalt) as feedstock. The plant is located inside the Saras refinery in Sarroch, Sardinia island (Italy). The plant has been built by Raggruppamento Temporaneo d'Imprese (RTI) formed by Snamprogetti, General Electric and Nuovo Pignone under a turnkey lump-sum contract. The paper will analyse the following aspects: · IGCC integration with the refinery: benefits and synergism; · IGCC technical description, multiple train configuration and availability considerations; · Environmental aspects: emissions survey, had ling of filter cake, water saving; · Construction issues: schedule, criticality and solutions; · Key operational issues. The information reported in the following pages refer to February 2000. These data will be updated during the Conference.
Item type: Congresos (trabajos presentados)
Holdings
Current library Call number Status Barcode
Biblioteca Alejandro Angel Bulgheroni CD W938 1 0013960 (Browse shelf(Opens below)) Not for loan 200006039

Resumen del autor, extraído del trabajo. Sarlux (a joint venture between Saras and ENRON) is developing a new Integrated Gasification Combined Cycle (IGCC) plant designed to produce in an environmentally acceptable manner electric power (551 MWe), steam (180 t/h) and hydrogen (40,000 Nm3/h) using high sulphur refinery residuals (TAR, Vacuum Residue and Asphalt) as feedstock. The plant is located inside the Saras refinery in Sarroch, Sardinia island (Italy). The plant has been built by Raggruppamento Temporaneo d'Imprese (RTI) formed by Snamprogetti, General Electric and Nuovo Pignone under a turnkey lump-sum contract. The paper will analyse the following aspects: · IGCC integration with the refinery: benefits and synergism; · IGCC technical description, multiple train configuration and availability considerations; · Environmental aspects: emissions survey, had ling of filter cake, water saving; · Construction issues: schedule, criticality and solutions; · Key operational issues. The information reported in the following pages refer to February 2000. These data will be updated during the Conference.



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales