The Sarlus IGCC Project construction overview and commissioning experience (Record no. 133547)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 01988nmc a2200277 4500 |
| 008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL | |
| Campo de control de longitud fija | 260224s xxu |
| 082 ## - CLASIFICACIÓN DEWEY | |
| Número de clasificación | CD W938 1 0013960 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Allevi, Claudio |
| 9 (RLIN) | 9839 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Collodi, Guido |
| 9 (RLIN) | 9840 |
| 110 2# - RESPONSABLE INSTITUCIONAL | |
| Responsable Institucional | Sarlux (Italia) |
| 9 (RLIN) | 9841 |
| 110 2# - RESPONSABLE INSTITUCIONAL | |
| Responsable Institucional | Snamprogetti (Italia) |
| 9 (RLIN) | 9842 |
| 111 2# - AUTORIDAD DE CONGRESO | |
| Nombre de congreso | World Petroleum Congress (16th. : 2000 jun. 11-15 : Calgary, Alberta, Canada) |
| 9 (RLIN) | 34 |
| 210 ## - TITULO ABREVIADO | |
| Título abreviado | WPC (16th.) |
| 245 00 - TITULO | |
| Título | The Sarlus IGCC Project construction overview and commissioning experience |
| 270 ## - FECHA DE CARGA | |
| Fecha de carga | 12/09/06 ; 26/08/2003 |
| 300 ## - DESCRIPCION FISICA | |
| Otra extensión | 5 p. |
| 520 ## - RESUMEN, ETC | |
| Resumen | Resumen del autor, extraído del trabajo. Sarlux (a joint venture between Saras and ENRON) is developing a new Integrated Gasification Combined Cycle (IGCC) plant designed to produce in an environmentally acceptable manner electric power (551 MWe), steam (180 t/h) and hydrogen (40,000 Nm3/h) using high sulphur refinery residuals (TAR, Vacuum Residue and Asphalt) as feedstock. The plant is located inside the Saras refinery in Sarroch, Sardinia island (Italy). The plant has been built by Raggruppamento Temporaneo d'Imprese (RTI) formed by Snamprogetti, General Electric and Nuovo Pignone under a turnkey lump-sum contract. The paper will analyse the following aspects: · IGCC integration with the refinery: benefits and synergism; · IGCC technical description, multiple train configuration and availability considerations; · Environmental aspects: emissions survey, had ling of filter cake, water saving; · Construction issues: schedule, criticality and solutions; · Key operational issues. The information reported in the following pages refer to February 2000. These data will be updated during the Conference. |
| 700 1# - OTRA AUTORIDAD PERSONAL | |
| Nombre | Collodi, Guido |
| 9 (RLIN) | 9840 |
| 710 2# - OTRA AUTORIDAD CORPORATIVA | |
| Nombre Institucional | Sarlux (Italia) |
| 9 (RLIN) | 9841 |
| 710 2# - OTRA AUTORIDAD CORPORATIVA | |
| Nombre Institucional | Snamprogetti (Italia) |
| 9 (RLIN) | 9842 |
| 773 ## - CORRECCIÓN | |
| Partes relacionadas | v. 3, p. 238 |
| 800 1# - RESPONSABLE EDICION | |
| Nombre | Allevi, Claudio |
| 9 (RLIN) | 9839 |
| 942 ## - DESC. DE MATERIAL | |
| Tipo de item KOHA | Congresos (trabajos presentados) |
| Biblioteca propietaria | Biblioteca actual | Ubicación | Fecha de adquisición | Inventario | Total de préstamos | Signatura topográfica | Inventario | Fecha de carga | Tipo de item KOHA |
|---|---|---|---|---|---|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Biblioteca Alejandro Angel Bulgheroni | CD W938 1 0013960 | 04/03/2026 | 200006039 | CD W938 1 0013960 | 200006039 | 04/03/2026 | Archivo electrónico |