Case History: First Coiled-Tubing-Conveyed Live Well Intervention Run From a Semi-Submersible Platform in Brazil to Increase Perforation Length in a Deep Water Horizontal Wellbore SPE 69519
Language: Inglés Series: Rosetto, Ilton ; Publication details: Dallas, Texas Society of Petroleum Engineers 2001Subject(s): Online resources: Summary: This paper will describe the first coiled-tubing-conveyed perforating (CTCP) jobs performed offshore in a horizontal well in the Campos Basin, Río de Janeiro, Brazil. The operation was needed to obtain the objectives sought after for this well and also to provide a "learning curve" for a major job that was to be run subsequent to this job using the same method. The second job was to be in a water depth of 968 ft., and more than 1,000 ft. of guns would be run. Both jobs will be discussed in this paper along with the advantages gained on the second job from the first experience. The first procedure required perforating of a 262-ft. interval in a 92-degree horizontal well using 2 in., 6 SPF super deep penetration scalloped guns that would be coiled-tubing deployed through 3-½ in. production tubing. The operation was to be performed from a semi-submersible platform, and the running and retrieving of the perforating guns would have to be accomplished without killing the well so that damaging completion fluids would not come into contact with the reservoir. Requirements for the job were that a safe method be used and that equipment and operational costs be kept at minimum so that a greater return on investment could be realized. Operational conditions included the following: 1. Perforation was to be conducted with the well in an underbalanced condition so that no formation damage would be sustained. 2. The operation had to be run from a semi-submersible 5 3. that was set in a water depth of 430 ft. (2 nd job performed in a water depth of 968 ft.) 4. The gun assembly would have to pass through a 2.81-in. minimum ID. He two jobs were completed under live well conditions, and both were successful. The estimated cost saving from elimination of 3 days of rig time for the second job was approximately $360,000. Even more significant for this technology, there are no documented jobs in which this perforation length has been attempted anywhere in the world from a semi-submersible or where the water-depth distance was used as a lubricator for the guns| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca virtual | Not for loan | 200003085 |
This paper will describe the first coiled-tubing-conveyed perforating (CTCP) jobs performed offshore in a horizontal well in the Campos Basin, Río de Janeiro, Brazil. The operation was needed to obtain the objectives sought after for this well and also to provide a "learning curve" for a major job that was to be run subsequent to this job using the same method. The second job was to be in a water depth of 968 ft., and more than 1,000 ft. of guns would be run. Both jobs will be discussed in this paper along with the advantages gained on the second job from the first experience. The first procedure required perforating of a 262-ft. interval in a 92-degree horizontal well using 2 in., 6 SPF super deep penetration scalloped guns that would be coiled-tubing deployed through 3-½ in. production tubing. The operation was to be performed from a semi-submersible platform, and the running and retrieving of the perforating guns would have to be accomplished without killing the well so that damaging completion fluids would not come into contact with the reservoir. Requirements for the job were that a safe method be used and that equipment and operational costs be kept at minimum so that a greater return on investment could be realized. Operational conditions included the following: 1. Perforation was to be conducted with the well in an underbalanced condition so that no formation damage would be sustained. 2. The operation had to be run from a semi-submersible 5 3. that was set in a water depth of 430 ft. (2 nd job performed in a water depth of 968 ft.) 4. The gun assembly would have to pass through a 2.81-in. minimum ID. He two jobs were completed under live well conditions, and both were successful. The estimated cost saving from elimination of 3 days of rig time for the second job was approximately $360,000. Even more significant for this technology, there are no documented jobs in which this perforation length has been attempted anywhere in the world from a semi-submersible or where the water-depth distance was used as a lubricator for the guns