Case History: First Coiled-Tubing-Conveyed Live Well Intervention Run From a Semi-Submersible Platform in Brazil to Increase Perforation Length in a Deep Water Horizontal Wellbore (Record no. 131028)

MARC details
000 -LEADER
fixed length control field 03399nmc a2200289 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s2001 xxu ing
041 ## - IDIOMA
Idioma Inglés
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Rosetto, Ilton
9 (RLIN) 6193
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Schoener-Scott, Martín
9 (RLIN) 6194
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Fulvio Etcheverry, Carlos
9 (RLIN) 6195
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Almeida, José
9 (RLIN) 6196
111 2# - AUTORIDAD DE CONGRESO
Nombre de congreso Latin American and Caribbean Petroleum Engineering Conference (7th : 2001 mar. 25-28 : Buenos Aires, Argentina)
9 (RLIN) 5738
245 00 - TITULO
Título Case History: First Coiled-Tubing-Conveyed Live Well Intervention Run From a Semi-Submersible Platform in Brazil to Increase Perforation Length in a Deep Water Horizontal Wellbore
Subtítulo SPE 69519
260 ## - PUBLICACION, DISTRIBUCION, ETC
Lugar de publicación, distribución, etc. Dallas, Texas
Nombre de publicador, distribuidor, etc. Society of Petroleum Engineers
Fecha de publicación, distribución, etc. 2001
270 ## - FECHA DE CARGA
Fecha de carga 12/09/06 ; 09/05/2003
520 ## - RESUMEN, ETC
Resumen This paper will describe the first coiled-tubing-conveyed perforating (CTCP) jobs performed offshore in a horizontal well in the Campos Basin, Río de Janeiro, Brazil. The operation was needed to obtain the objectives sought after for this well and also to provide a "learning curve" for a major job that was to be run subsequent to this job using the same method. The second job was to be in a water depth of 968 ft., and more than 1,000 ft. of guns would be run. Both jobs will be discussed in this paper along with the advantages gained on the second job from the first experience. The first procedure required perforating of a 262-ft. interval in a 92-degree horizontal well using 2 in., 6 SPF super deep penetration scalloped guns that would be coiled-tubing deployed through 3-½ in. production tubing. The operation was to be performed from a semi-submersible platform, and the running and retrieving of the perforating guns would have to be accomplished without killing the well so that damaging completion fluids would not come into contact with the reservoir. Requirements for the job were that a safe method be used and that equipment and operational costs be kept at minimum so that a greater return on investment could be realized. Operational conditions included the following: 1. Perforation was to be conducted with the well in an underbalanced condition so that no formation damage would be sustained. 2. The operation had to be run from a semi-submersible 5 3. that was set in a water depth of 430 ft. (2 nd job performed in a water depth of 968 ft.) 4. The gun assembly would have to pass through a 2.81-in. minimum ID. He two jobs were completed under live well conditions, and both were successful. The estimated cost saving from elimination of 3 days of rig time for the second job was approximately $360,000. Even more significant for this technology, there are no documented jobs in which this perforation length has been attempted anywhere in the world from a semi-submersible or where the water-depth distance was used as a lubricator for the guns
650 #0 - MATERIA
Término tópico Perforación bajo balance
9 (RLIN) 2538
700 1# - OTRA AUTORIDAD PERSONAL
Nombre Schoener-Scott, Martín
9 (RLIN) 6194
700 1# - OTRA AUTORIDAD PERSONAL
Nombre Fulvio Etcheverry, Carlos
9 (RLIN) 6195
700 1# - OTRA AUTORIDAD PERSONAL
Nombre Almeida, José
9 (RLIN) 6196
711 2# - ENTRADA AGREGADA--NOMBRE DE REUNIÓN
Nombre de congreso/reunión o jurisdicción como elemento de entrada Latin American and Caribbean Petroleum Engineering Conference (7th : 2001 mar. 25-28 : Buenos Aires, Argentina)
800 1# - RESPONSABLE EDICION
Nombre Rosetto, Ilton
9 (RLIN) 6193
856 ## - LINK
Link <a href="https://biblioteca.iapg.org.ar/ArchivosAdjuntos/LACPEC2001/Spe69519.pdf">https://biblioteca.iapg.org.ar/ArchivosAdjuntos/LACPEC2001/Spe69519.pdf</a>
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Congresos (trabajos presentados)
Fuente de clasificación Dewey Decimal Classification
Holdings
Biblioteca propietaria Biblioteca actual Fecha de adquisición Inventario Total de préstamos Inventario Fecha de carga Tipo de item KOHA
Biblioteca virtual Biblioteca virtual 03/03/2026 200003085   200003085 03/03/2026 Archivo electrónico


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales