GERENCIAMIENTO DE AGUA EN CAMPOS MADUROS (Record no. 196178)

MARC details
000 -LEADER
fixed length control field 02751nmc a2200253 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s xxu
082 ## - CLASIFICACIÓN DEWEY
Número de clasificación 068.82 553.28 C62 15730
210 ## - TITULO ABREVIADO
Título abreviado Simposio Campos Maduros
245 00 - TITULO
Título GERENCIAMIENTO DE AGUA EN CAMPOS MADUROS
270 ## - FECHA DE CARGA
Fecha de carga 12/10/2023 ; 12/10/2023
300 ## - DESCRIPCION FISICA
Otra extensión 16 p. ; 73-87
520 ## - RESUMEN, ETC
Resumen The purpose of this work is focused on solving how efficient the water management has been in Los Perales oil field, to be able to show improvement points that allow prioritizing the resource, capitalizing on the remaining oil with the current infrastructure and sitting down the bases for a future growth from an optimal condition of operation of the field. The need arises because of the lack of water sources in secondary recovery projects implemented in the recent years. Throughout the history of the field, the focus has always been on oil production, then gas and produced and injected water in third place. Even today it is difficult to concentrate on injectors first and then oil and gas producers, although 70% of crude oil production is by secondary recovery and each injector, at least, supports around four to five producers. The absence of attention on the circulating water in the system is a major problem in the management of the field, and so, this present project attempt to highlight the importance of knowing which reservoirs represents the 80% of the oil field production in order to make a good use of the resource. The objective is to be able to reach an acceptable injection rate to sweep the remaining oil trying to minimize the lifting cost. There are excellent examples in oil fields near by the analysis area, that proves how important is to have the injection as a priority and a strong work on surveillance waterflooding projects for maintaining the base curve. There is also enough injection pressure to reach the target of injection rate per layer and get the maximum potential of the field. This work will allow to indicate the north in the optimization of the field with the current infrastructure as well as to define an optimized base curve based on the requirements of the reservoir, allowing to show some preliminary results of the redistribution.
773 ## - CORRECCIÓN
Partes relacionadas
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Congresos (trabajos presentados)
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Hermann, Erich
9 (RLIN) 57881
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Maidana, Alejandro
9 (RLIN) 61261
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Mora, Nicolás
9 (RLIN) 55846
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Capitillo, José
9 (RLIN) 61481
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Sánchez, Luis
9 (RLIN) 61482
111 2# - AUTORIDAD DE CONGRESO
Nombre de congreso Congreso de Exploración y Desarrollo de Hidrocarburos (11er : 2022 nov. 8 - 11 : Mendoza)
9 (RLIN) 61064
856 ## - LINK
Link <a href="https://biblioteca.iapg.org.ar/ArchivosAdjuntos/Conexplor2022/Simp.CamposMaduros/campos-maduros05.pdf">https://biblioteca.iapg.org.ar/ArchivosAdjuntos/Conexplor2022/Simp.CamposMaduros/campos-maduros05.pdf</a>
Holdings
Biblioteca propietaria Biblioteca actual Ubicación Fecha de adquisición Inventario Total de préstamos Signatura topográfica Inventario Fecha de carga Tipo de item KOHA
Biblioteca virtual Biblioteca virtual 068.82 553.28 C62 15730 06/03/2026 200068596   068.82 553.28 C62 15730 200068596 06/03/2026 Archivo electrónico


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales