Combination of managed pressure drilling and casing while drilling techniques (Record no. 190470)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 01934nmc a2200205 4500 |
| 008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL | |
| Campo de control de longitud fija | 260224s xxu |
| 245 00 - TITULO | |
| Título | Combination of managed pressure drilling and casing while drilling techniques |
| Subtítulo | Comparison, advantages and operational challenges |
| 270 ## - FECHA DE CARGA | |
| Fecha de carga | 15/06/2017 ; 15/06/2017 |
| 300 ## - DESCRIPCION FISICA | |
| Otra extensión | 14 p. |
| 520 ## - RESUMEN, ETC | |
| Resumen | The application of Managed Pressure Drilling technology has been proved to be beneficial to the well construction in wells with narrow operating windows where it is necessary to work in different scenarios of fluid losses and influxes. Despite its major advantages, MPD still depends on high density muds to kill the well during tripping out; these operations are performed in a delicate balance that can be lost causing well control events while tripping. However, the combination of MPD with casing while drilling (CwD) techniques has raised as a new alternative to continue optimizing drilling projects. This integration has brought new challenges within MPD engineering and the need to adapt procedures to this new methodology to obtain excellent results. The objective of this article is to analyze changes in MPD, comparing cases of wells drilled with conventional BHA and wells drilled with casing. Software simulation analysis will be utilized to compare advantages and looking for opportunities in order to improve efficiency |
| 773 ## - CORRECCIÓN | |
| Partes relacionadas | |
| 942 ## - DESC. DE MATERIAL | |
| Tipo de item KOHA | Congresos (trabajos presentados) |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Hechem, Juan Ignacio |
| 9 (RLIN) | 52715 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Caprini, Juan José |
| 9 (RLIN) | 55281 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Abraham, Facundo |
| 9 (RLIN) | 55282 |
| 111 2# - AUTORIDAD DE CONGRESO | |
| Nombre de congreso | Congreso Latinoamericano y del Caribe de Perforación, Terminación, Reparación y Servicio de Pozos (2do. : 2015 oct. 5-8 : Buenos Aires) |
| 9 (RLIN) | 56622 |
| 856 ## - LINK | |
| Link | <a href="https://biblioteca.iapg.org.ar/ArchivosAdjuntos/Congreso-Latinoamericano-y-del-Caribe-de-Perforaci n-Terminaci n,-Reparaci n-y-servicio-de-Pozos-2015/465.pdf">https://biblioteca.iapg.org.ar/ArchivosAdjuntos/Congreso-Latinoamericano-y-del-Caribe-de-Perforaci n-Terminaci n,-Reparaci n-y-servicio-de-Pozos-2015/465.pdf</a> |
| Biblioteca propietaria | Biblioteca actual | Fecha de adquisición | Inventario | Total de préstamos | Inventario | Fecha de carga | Tipo de item KOHA |
|---|---|---|---|---|---|---|---|
| Colección Digital IAPG | Colección Digital IAPG | 06/03/2026 | 200062725 | 200062725 | 06/03/2026 | Archivo electrónico |



