Teaching an old dog new tricks (Record no. 149615)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02339nmc a2200241 4500 |
| 008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL | |
| Campo de control de longitud fija | 260224s xxu |
| 082 ## - CLASIFICACIÓN DEWEY | |
| Número de clasificación | CD I249 1 0013788 |
| 245 00 - TITULO | |
| Título | Teaching an old dog new tricks |
| Subtítulo | The conversion of the LNG peak shaving plant at the Isle of Grain, UK, into an import terminal |
| 270 ## - FECHA DE CARGA | |
| Fecha de carga | 12/09/06 ; 22/07/2003 |
| 300 ## - DESCRIPCION FISICA | |
| Otra extensión | 10 p. |
| 500 ## - NOTAS | |
| Nota general | Disponible en CD en formato PDF |
| 520 ## - RESUMEN, ETC | |
| Resumen | Transcripción del abstract original del autor: The dynamics of the UK natural gas market will change considerably over the next decade as demand increases and indigenous production declines. The UK will no longer be self sufficient in natural gas and demand will increasingly be met by importing gas via interconnecting pipelines from Europe and through LNG. The UK currently does not have import facilities for LNG shipments and the challenge of the project described in this paper is to convert an operational LNG peak shaving plant, at the Isle of Grain, into an import terminal ready to commence base load operation in 2005. The philosophy of the design is to re-use, where possible, existing equipment to minimise the cost of the project and the lead time, whilst ensuring that the infrastructure remains viable for the next 25 years. The success of the project is influenced by many factors including system design and life extension, operational strategy, equipment reliability and supply contracts. A key consideration is ensuring that the facility will deliver the required business performance once in operation. Particular issues covered in this paper are availability modelling, for a range of scenarios, which has allowed bottlenecks in the terminal design to be identified and eliminated; the LNG storage tank decommissioning process and modifications required to upgrade the tanks to import duty; and the quantification of risks posed by the LNG jetty and the transfer pipeline from the jetty to the Isle of Grain site. |
| 773 ## - CORRECCIÓN | |
| Partes relacionadas | |
| 942 ## - DESC. DE MATERIAL | |
| Tipo de item KOHA | Congresos (trabajos presentados) |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Haynes, David |
| 9 (RLIN) | 22220 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Martin, Paul |
| 9 (RLIN) | 22221 |
| 110 2# - RESPONSABLE INSTITUCIONAL | |
| Responsable Institucional | International Gas Union, IGU |
| 9 (RLIN) | 13105 |
| 111 2# - AUTORIDAD DE CONGRESO | |
| Nombre de congreso | World Gas Conference (22nd. : 2003 jun 1-5 : Tokyo) |
| 9 (RLIN) | 22029 |
| 700 1# - OTRA AUTORIDAD PERSONAL | |
| Nombre | Martin, Paul |
| 9 (RLIN) | 22221 |
| 710 2# - OTRA AUTORIDAD CORPORATIVA | |
| Nombre Institucional | International Gas Union, IGU |
| 9 (RLIN) | 13105 |
| Biblioteca propietaria | Biblioteca actual | Ubicación | Fecha de adquisición | Inventario | Total de préstamos | Signatura topográfica | Inventario | Fecha de carga | Tipo de item KOHA |
|---|---|---|---|---|---|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Biblioteca Alejandro Angel Bulgheroni | CD I249 1 0013788 | 04/03/2026 | 200025608 | CD I249 1 0013788 | 200025608 | 04/03/2026 | Archivo electrónico |



