Imagen de Google Jackets

Failure of a new 8-in pipeline from Group Gathering Station to Central Tank Farm

Por: Detalles de publicación: mayo 2011Descripción: 4 p. ; 50-53 En: Materials Performance 50Resumen: Transcripción del resumen del autor. An 8-in (203-mm) oil dispatch pipeline failed from internal corrosion withing eight months of commissioning. The premature failure is attributed to extremely high microbe content, significant quantity of volatile fatty acids, underdeposit pitting/crevice corrosion during stagnant flow, and the absence of pigging. Recommended chemical treatment and pigging practices have been implemented
Tipo de ítem: Artículo de Revista
Existencias
Biblioteca actual Estado Código de barras
Biblioteca Alejandro Angel Bulgheroni No para préstamo 200053858

Transcripción del resumen del autor. An 8-in (203-mm) oil dispatch pipeline failed from internal corrosion withing eight months of commissioning. The premature failure is attributed to extremely high microbe content, significant quantity of volatile fatty acids, underdeposit pitting/crevice corrosion during stagnant flow, and the absence of pigging. Recommended chemical treatment and pigging practices have been implemented

5



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales