Failure of a new 8-in pipeline from Group Gathering Station to Central Tank Farm
Bhat, S. Kumar, Bipin Prasad, S.R.
Failure of a new 8-in pipeline from Group Gathering Station to Central Tank Farm - mayo 2011 - 4 p. ; 50-53
Transcripción del resumen del autor. An 8-in (203-mm) oil dispatch pipeline failed from internal corrosion withing eight months of commissioning. The premature failure is attributed to extremely high microbe content, significant quantity of volatile fatty acids, underdeposit pitting/crevice corrosion during stagnant flow, and the absence of pigging. Recommended chemical treatment and pigging practices have been implemented
5
Failure of a new 8-in pipeline from Group Gathering Station to Central Tank Farm - mayo 2011 - 4 p. ; 50-53
Transcripción del resumen del autor. An 8-in (203-mm) oil dispatch pipeline failed from internal corrosion withing eight months of commissioning. The premature failure is attributed to extremely high microbe content, significant quantity of volatile fatty acids, underdeposit pitting/crevice corrosion during stagnant flow, and the absence of pigging. Recommended chemical treatment and pigging practices have been implemented
5



