Image from Google Jackets

Use of Coiled-Tubing on Production Wells Located in the San Jorge Basin SPE 69409

By: Contributor(s): Language: Inglés Series: Zurita, D.N ; Publication details: Dallas, Texas Society of Petroleum Engineers 2001Online resources: Summary: In the continuous search of the optimization of investments and the reduction of operative costs, Repsol-YPF decided to research the possibility of the use of Coiled Tubing to produce traditional diameter wells at the Golfo San Jorge Basin. This represents a further step after an experience undertaken in reduced diameters started in 1997 1 . Through this new experience it was proven that it is posible to produce wells with diameters higher than 3.5 in. Using coiled tubing in mechanical pumping, generating at the same time new possiblilities for coiled tubing with other artificial lift systems.
Item type: Congresos (trabajos presentados)
Holdings
Current library Status Barcode
Biblioteca virtual Not for loan 200002897

In the continuous search of the optimization of investments and the reduction of operative costs, Repsol-YPF decided to research the possibility of the use of Coiled Tubing to produce traditional diameter wells at the Golfo San Jorge Basin. This represents a further step after an experience undertaken in reduced diameters started in 1997 1 . Through this new experience it was proven that it is posible to produce wells with diameters higher than 3.5 in. Using coiled tubing in mechanical pumping, generating at the same time new possiblilities for coiled tubing with other artificial lift systems.



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales