Use of Coiled-Tubing on Production Wells Located in the San Jorge Basin SPE 69409
Zurita, D.N. Abella, F.J. Luongo, S. Maino, J.C. Montenegro, E.M. Panza, L.A. Lopez, R.E. Sequra, H.R. Romero, V.M. Gómez Cavieres, G.E. Homes, A.H. Romero, E.O.
Use of Coiled-Tubing on Production Wells Located in the San Jorge Basin SPE 69409 - Dallas, Texas Society of Petroleum Engineers 2001 - Zurita, D.N. .
In the continuous search of the optimization of investments and the reduction of operative costs, Repsol-YPF decided to research the possibility of the use of Coiled Tubing to produce traditional diameter wells at the Golfo San Jorge Basin. This represents a further step after an experience undertaken in reduced diameters started in 1997 1 . Through this new experience it was proven that it is posible to produce wells with diameters higher than 3.5 in. Using coiled tubing in mechanical pumping, generating at the same time new possiblilities for coiled tubing with other artificial lift systems.
Use of Coiled-Tubing on Production Wells Located in the San Jorge Basin SPE 69409 - Dallas, Texas Society of Petroleum Engineers 2001 - Zurita, D.N. .
In the continuous search of the optimization of investments and the reduction of operative costs, Repsol-YPF decided to research the possibility of the use of Coiled Tubing to produce traditional diameter wells at the Golfo San Jorge Basin. This represents a further step after an experience undertaken in reduced diameters started in 1997 1 . Through this new experience it was proven that it is posible to produce wells with diameters higher than 3.5 in. Using coiled tubing in mechanical pumping, generating at the same time new possiblilities for coiled tubing with other artificial lift systems.



