000 01059nam a2200241 4500
005 20260608203253.0
008 260224s2019 dcu
082 _aCaja 22-B
210 _aAPI TR 1179
245 0 0 _aHydrostatic Testing as an Integrity Management Tool
_bAPI Technical Report 1179
246 1 _a1179
250 _a1ra. ed.
260 _aWashington
_bAmerican Petroleum Institute, API
_c2019
270 _a28/03/2023 ; 28/03/2023
300 _a52 p.
520 _aThis technical report provides guidelines related to hydrostatic testing as a tool for integrity management in gas and liquids pipelines. It specifically focuses on program design and key parameters for consideration in hydrostatic test programs, as well as potential detrimental effects of hydrostatic testing. Several case studies (see Annex A) supplement the guidelines provided.
773 _g
942 _cNORMA
110 2 _aAmerican Petroleum Institute, API
_9105
650 0 _aNormalización
_9106
650 0 _aNormas API
_9109
999 _c195550
_d195550