| 000 | 01885nam a2200217 4500 | ||
|---|---|---|---|
| 005 | 20260521171552.0 | ||
| 008 | 260224s2018 xxu esp | ||
| 041 | _aEspañol | ||
| 082 | _a068.82 553.28 C62 2018 0015647 | ||
| 100 | 1 |
_aSiehankiewicz, Darío _956054 |
|
| 111 | 2 |
_aCongreso de Exploración y Desarrollo de Hidrocarburos (10mo. : 2018 nov. 5 - 9 : Mendoza) _9573 |
|
| 111 | 2 |
_aJornadas de Geotecnología (6tas. : 2018 nov. 5 - 9 : Mendoza) _9574 |
|
| 245 | 0 | 0 | _aUso de studio como repositorio de información dinámica aplicado en el Área de desarrollo Fortín de Piedra |
| 260 | _c2018 | ||
| 270 | _a06/07/2022 ; 13/05/2019 | ||
| 300 | _a10 p. ; 49-59 | ||
| 520 | _aSince 2014 year that was implemented Petrel Studio, Tecpetrol has a database with repositories classified for Country and Basin. For this job, it is used the "Cuenca Neuquina" repository. This repository has all information about areas where Tecpetrol has activities on this basin. Data Management was responsible in design, load and quality control of this information. The users are connecting from Petrel to Studio for bring the information and only they can load interpretations on Studio. Due to the development of unconventional resources in "Fortín de Piedra" area by Tecpetrol, It was necessary in E&P to create a database with dynamic data that allow to do an interaction in real time of the information generated during the drilling activities between the Petrel Studio ś users.Therefore, it is created a new repository called "Neuquina Shale" with a specific structure for this information oriented to the development of areas with horizontal wells and with more access permission to users to interact with the database. | ||
| 856 | _uhttps://biblioteca.iapg.org.ar/ArchivosAdjuntos/Conexplor2018/SGeot/1690.pdf | ||
| 942 |
_cCONGTP _2ddc |
||
| 999 |
_c192878 _d192878 |
||