000 02994nmc a2200205 4500
005 20260520010332.0
008 260224s xxu
082 _aCD I116 64 0015469
245 0 0 _aTecnología combinada de cañoneo con desbalance dinámico mejora productividad con menor tiempo de taladro una experiencia satisfactoria en Shushufindi
270 _a16/11/2016 ; 16/11/2016
300 _a17 p.
520 _aPerforation technologies enable maximun productivity with minimal rig time. A successful experience in Shushufindi Field The Shushufindi field Classified as a brown field, has a 400-square-kilometer area holds the largest reserves and currently produces 70 M BOPD, approximately 10 percent of the country’s total oil production. In 2012 a proposal to increase levels of investment and field activity was done by Schlumberger to the government forming a consortium under a specific services contract, where the consortium deploys the capital in order to comply with a minimum commitment of new wells, including production optimization, among other contractual obligations. As with many other brownfields, the challenges are numerous; in the case of Shushufindi field, the combination of factors including progressive water cut increase, corrosive environment, scale deposits, and aging production facilities presents a great challenge to the exploitation. Multidisciplinary efforts have been made to understand the geology and the dynamics of the fluid within the main productive sands to optimize current production and to accelerate production of proven reserves. As part of the strategy to start the project execution immediately after contract signature, a multidisciplinary group started to construct all the design bases required for operation in new wells and workover. After several months of investigation, the dynamic underbalance perforating technology was identify last 2012 as one of the options to implement in Shushufindi field in order to optimize the oil production from the main reservoirs (Ui and Ti). This technology brings several advantages over the traditional perforating operations already deployed in the field in terms of installation time, clean perforations, minimizes and eliminates perforation damage, extremely beneficial to optimize the fluid production in a well. The paper describes all the stages performed for the correct design of completion fluid, planning and basis design for well preparation that are requirements for a successful operation in new wells, and a well performance analysis after a complete two years of operation (24 original completions).
773 _g
942 _cCONGTP
100 1 _aRodríguez, Juan Carlos
_91234
100 1 _aEgas, Ángel
_955814
111 2 _aCongreso de Exploración y Desarrollo de Hidrocarburos (9no. : 2014 nov. 3-7 : Mendoza)
_954287
999 _c189848
_d189848
856 _uhttps://biblioteca.iapg.org.ar/ArchivosAdjuntos/CONEXPLOR2014/673-Tecnologiacombinada.pdf