000 00815nab a2200193 4500
005 20260520004445.0
008 260224s2015 xxu ing
041 _aInglés
245 0 0 _aDual multi-purpose tower engineered to cut ultra-deepwater well delivery costs
260 _a
_b
_cabr. 2015
270 _a24/07/2015 ; 24/07/2015
300 _a9 p. ; 61-70
500 _aA number of drilling-the-well-on-paper (DWOP) exercises show increased tripping speeds, reduced fuel consumption by virtue of an integrated ship design, and the built-in efficiencies of the new DMPT, reducing ultra-deepwater well construction time and costs from 20% to 25% per well.
581 _a4
773 0 _tWorld Oil
_g236
942 _cARTICULO
100 1 _aWijning, Dieter
_936389
999 _c189059
_d189059