000 02045nab a2200217 4500
005 20260520004418.0
008 260224s2013 xxu ing
041 _aInglés
245 0 0 _aColorado Drill-Cuttings-Injection Pilot Results
260 _a
_b
_cmar. 2013
270 _a03/05/2013 ; 03/05/2013
300 _a9 p. ; 65-74
520 _aTraducción del resúmen del autor: From December 2007 through April 2011, the operator conducted a two-phase drill-cuttings-injection pilot at the Piceance field in western Colorado to reduce the environmental footprint of drilling operations. This was the first subsurface injection of drill cuttings in Colorado, and it used a lost-circulation zone in the Wasatch G formation as the injection interval. The first phase of the pilot was to assess the technical feasibility and formation response to injection. During this phase, waterbased mud and drill cuttings from four wells were injected into a fifth well that was temporarily suspended at the intermediate casing and perforated in the Wasatch G formation. More than 40,000 bbl of fluid was injected during vacuum conditions with confirmed confinement to the target zone. On the basis of the injection results, the pilot progressed to a second phase to assess the logistical requirements of transporting cuttings from multiple drilling locations to a central processingand-injection site. The injection well selected had experienced lost returns in the Wasatch G when originally drilled and was completed as a dedicated injector. The pilot processed cuttings from three active rigs, and it demonstrated the capacity to process cuttings from more than six rigs. The operator proved injection as a technically feasible option for drilling-waste disposal during full-field development at Piceance.
581 _a1
773 0 _tSPE Drilling & Completion
_g28
942 _cARTICULO
100 1 _aKunze, Kenneth R.
_916366
100 1 _aRomero, Edgar E.
_953078
100 1 _aDuck, Steven
_953079
999 _c187645
_d187645