| 000 | 00773nab a2200205 4500 | ||
|---|---|---|---|
| 005 | 20260520004319.0 | ||
| 008 | 260224s2006 xxu | ||
| 245 | 0 | 0 | _aCoke drum design |
| 260 |
_a _b _cjul./ago./sep. 2006 |
||
| 270 | _a16/08/2011 ; 16/08/2011 | ||
| 300 | _a7 p. ; 63-69 | ||
| 520 | _aTranscripcíón del resumen del autor. Issues to consider for extending the turnaround schedule of a delayed coking unit. Theory behind coke drum failure is discussed, with detailed solutions centred on drum design and support structures | ||
| 581 | _a4 | ||
| 773 | 0 |
_tPetroleum Technology Quarterly _g11 |
|
| 942 | _cARTICULO | ||
| 100 | 1 |
_aStewart, Coby W. _951225 |
|
| 100 | 1 |
_aStryk, Aaron M. _951226 |
|
| 100 | 1 |
_aPresley, Lee _951227 |
|
| 999 |
_c185084 _d185084 |
||