000 00773nab a2200205 4500
005 20260520004319.0
008 260224s2006 xxu
245 0 0 _aCoke drum design
260 _a
_b
_cjul./ago./sep. 2006
270 _a16/08/2011 ; 16/08/2011
300 _a7 p. ; 63-69
520 _aTranscripcíón del resumen del autor. Issues to consider for extending the turnaround schedule of a delayed coking unit. Theory behind coke drum failure is discussed, with detailed solutions centred on drum design and support structures
581 _a4
773 0 _tPetroleum Technology Quarterly
_g11
942 _cARTICULO
100 1 _aStewart, Coby W.
_951225
100 1 _aStryk, Aaron M.
_951226
100 1 _aPresley, Lee
_951227
999 _c185084
_d185084