| 000 | 00512nab a2200145 4500 | ||
|---|---|---|---|
| 005 | 20260520001916.0 | ||
| 008 | 260224s xxu | ||
| 245 | 0 | 0 |
_aImprove overpressure protection system for LNG _bRelief events require better planning to ensure safe plant operation |
| 270 | _a12/09/06 ; 31/07/2006 | ||
| 300 | _a6 p. | ||
| 773 | 0 |
_tHydrocarbon Processing _gvol. 85; no. 7 (jul. 2006), p. 61-67 |
|
| 942 | _cARTICULO | ||
| 100 | 1 |
_aWong, W.Y. _948894 |
|
| 999 |
_c180120 _d180120 |
||