| 000 | 00710nab a2200181 4500 | ||
|---|---|---|---|
| 005 | 20260520004155.0 | ||
| 008 | 260224s xxu | ||
| 245 | 0 | 0 | _aTest stand allows plant to monitor, detect, analyze and repair RCP bearing failures |
| 270 | _a12/09/06 ; 12/06/2006 | ||
| 300 | _a3 p. | ||
| 520 | _aIntermountain Power Service Corp. replaced its vintage hard panel simulator with a new simulator designed around its modern distributed control system. | ||
| 773 | 0 |
_tPower Engineering _gVol. 110, no. 5 (mayo 2006) ; p. 60-62 |
|
| 942 | _cARTICULO | ||
| 100 | 1 |
_aHansen, Teresa _937125 |
|
| 650 | 0 |
_aEnergĂa nuclear _91046 |
|
| 650 | 0 |
_aMonitoreo _932433 |
|
| 999 |
_c179694 _d179694 |
||