| 000 | 00630nab a2200181 4500 | ||
|---|---|---|---|
| 005 | 20260520004142.0 | ||
| 008 | 260224s xxu | ||
| 100 | 1 |
_aParrott, Ralph _947411 |
|
| 245 | 0 | 0 | _aClamping down on leaks |
| 270 | _a12/09/06 ; 28/02/2006 | ||
| 300 | _a2 p. | ||
| 520 | _aThe author details how PSI's emergency subsea leak repair clamp reduced pipeline production downtime. | ||
| 650 | 0 |
_aPérdidas en oleoductos y gasoductos _930106 |
|
| 650 | 0 |
_aReparación de tuberías _93117 |
|
| 773 | 0 |
_tWorld Pipelines _gVol. 6, no. 1 (ene. 2006) ; p. 55-56 |
|
| 942 | _cARTICULO | ||
| 999 |
_c178801 _d178801 |
||