000 00757nab a2200193 4500
005 20260520000959.0
008 260224s xxu
245 0 0 _aWhat to manage in MPD
270 _a12/09/06 ; 07/11/2005
300 _a2 p.
520 _aWhile the equipment for managed-pressure drilling offers much greater control, realizing the advantages of this technology requires careful planning and real-time management of the window between pore pressure and fracture gradient.
773 0 _tE & P
_gVol. 78, issue 10 (oct. 2005) ; p. 51-52
942 _cARTICULO
100 1 _aHobart, Steve
_947631
100 1 _aLang, James
_942904
650 0 _aPresión en pozos
_937084
700 1 _aLang, James
_942904
999 _c178443
_d178443