000 01001nab a2200181 4500
005 20260520002923.0
008 260224s2010 xxu
245 0 0 _aDesign and installation requirements for FRP pipe
260 _a
_b
_cmar. 2010
270 _a18/08/2010 ; 18/08/2010
300 _a4 p. ; 70-73
520 _aTranscripción del resumen del autor. The successful design and installation of fiberglass-reinforced plastic (FRP) pipe systems requires adherence to established design principles and practices. By understanding and applying these principles to FRP, plant operators may benefit from the advantages of FRP through lower installed and life cycle costs. This article will review some of the most important differences between steel and FRP pipe design and present a case history of a successful steel pipe replacement project.
581 _a3
773 0 _tMaterials Performance
_g49
942 _cARTICULO
100 1 _aHawkins, Robert C.
_946474
999 _c176111
_d176111