| 000 | 00532nab a2200181 4500 | ||
|---|---|---|---|
| 005 | 20260520000934.0 | ||
| 008 | 260224s2009 xxu | ||
| 245 | 0 | 0 |
_aMore than the sum of its part _bHow 20000-psi subsea BOP stack was designed, developed |
| 260 |
_a _b _cmayo 2009 |
||
| 270 | _a26/07/2010 ; 26/07/2010 | ||
| 300 | _a4 p. ; 76-79 | ||
| 581 | _a5 | ||
| 773 | 0 |
_tDrilling Contractor _g82 |
|
| 942 | _cARTICULO | ||
| 100 | 1 |
_aWhitby, Melvyn F. _945966 |
|
| 100 | 1 |
_aKotrla, John E. _945967 |
|
| 999 |
_c175406 _d175406 |
||