100 1 _aSong, F.M.
_924976
245 0 0 _aField Procedures to Estimate Corrosion Potentials and Rates and Cathodic Protection Penetration Limit in a Coating Disbonded Region on Buried Pipelines
260 _cmar. 2010
270 _a20/07/2010 ; 20/07/2010
300 _a12 p. ; 035005
520 _aTranscripción del resumen del autor. No field method or procedure exists to measure the effectiveness of cathodic protection (CP) in a coating disbonded region on buried pipelines; however, gaining this capability can be useful to assist the pipeline industry in better control of the pipeline external corrosion. This paper reports two field procedures to estimate the corrosion potentials and rates in a coating disbonded region on buried pipelines and a method to estimate the maximum distance that CP current can penetrate into a coating disbonded region from the holiday. The above estimates can be accomplished through the use of sampled near-pipe soil chemistry, measured pipe native or rest potential, CP "instant-off" potential, and a corrosion rate of the pipe steel measured in simulated soil groundwater in deaerated condition. The field procedures can be implemented without the need of excavations to expose the pipeline surface. The corrosion rates thus determined can be used to assist in prioritizing corrosion susceptible locations along a pipeline segment and determining the re-inspection interval at a given location. These field procedures are not developed for estimating pit or crack growth rates, if present, in the disbonded region.
581 _a3
773 0 _tCorrosion
_g66
942 _cARTICULO
_2ddc
999 _c175119
_d175119