000 00764nab a2200193 4500
005 20260520004034.0
008 260224s2010 xxu
245 0 0 _aAnalysis of gas flow yields recommendations for best cementing practices
_bAn investigation into the flow of gas at a shallow water platform after the 9%-in. casing was cemented revealed that following good cementing practices could have prevented a potentially serious well control incident
260 _a
_b
_cene. 2010
270 _a14/07/2010 ; 14/07/2010
300 _a7 p. ; 33-39
581 _a1
773 0 _tWorld Oil
_g231
942 _cARTICULO
100 1 _aOskarsen, Ray T.
_945675
100 1 _aWright, John W.
_945676
100 1 _aWalzel, Danny
_945677
999 _c175015
_d175015