| 000 | 01090nam a2200205 4500 | ||
|---|---|---|---|
| 005 | 20260520010147.0 | ||
| 008 | 260224s xxu | ||
| 245 | 0 | 0 |
_aNETWORK LIFE TIME. Increased Service Life in the design, construction, operation and maintenance of a Gas Pipeline _bWOC 3 SG 3..2 |
| 270 | _a02/09/2025 ; 2009-09-02 | ||
| 300 | _a57 p. | ||
| 500 | _aEste documento está en CD en nuestra biblioteca, consulte por su disponibilidad. | ||
| 520 | _aObjective of the SG3.2 group: To evaluate what is necessary to do in the old pipeline, to extend the operation period and to get them up to their highest capacity. The study group has decided to focus on the high pH SCC, due to the impact that this phenomenon has in the pipeline integrity and the insufficient methods for its detection nowadays | ||
| 773 | _g | ||
| 942 | _cCONGTP | ||
| 100 | 1 |
_aBonetto, Jorge _941918 |
|
| 110 | 2 |
_aInternational Gas Union _921624 |
|
| 111 | 2 |
_aWorld Gas Conference (23rd. : 2006 jun 5-9 : Amsterdam, The Netherlands) _939854 |
|
| 650 | 0 |
_aRusia _97847 |
|
| 999 |
_c170427 _d170427 |
||