000 01090nam a2200205 4500
005 20260520010147.0
008 260224s xxu
245 0 0 _aNETWORK LIFE TIME. Increased Service Life in the design, construction, operation and maintenance of a Gas Pipeline
_bWOC 3 SG 3..2
270 _a02/09/2025 ; 2009-09-02
300 _a57 p.
500 _aEste documento está en CD en nuestra biblioteca, consulte por su disponibilidad.
520 _aObjective of the SG3.2 group: To evaluate what is necessary to do in the old pipeline, to extend the operation period and to get them up to their highest capacity. The study group has decided to focus on the high pH SCC, due to the impact that this phenomenon has in the pipeline integrity and the insufficient methods for its detection nowadays
773 _g
942 _cCONGTP
100 1 _aBonetto, Jorge
_941918
110 2 _aInternational Gas Union
_921624
111 2 _aWorld Gas Conference (23rd. : 2006 jun 5-9 : Amsterdam, The Netherlands)
_939854
650 0 _aRusia
_97847
999 _c170427
_d170427