| 000 | 00563nab a2200181 4500 | ||
|---|---|---|---|
| 005 | 20260520001748.0 | ||
| 008 | 260224s2009 xxu | ||
| 245 | 0 | 0 | _aHistory match of the UTF phase a project with coupled reservoir geomechanical simulation |
| 260 |
_a _b _cene. 2009 |
||
| 270 | _a26/05/2009 ; 26/05/2009 | ||
| 300 | _a6 p. ; 29-35 | ||
| 581 | _a1 | ||
| 773 | 0 |
_tJournal of Canadian Petroleum Technology _g48 |
|
| 942 | _cARTICULO | ||
| 100 | 1 |
_aLi, P. _941159 |
|
| 100 | 1 |
_aChalaturnyk, R.J. _941160 |
|
| 999 |
_c169783 _d169783 |
||