| 000 | 00558nab a2200181 4500 | ||
|---|---|---|---|
| 005 | 20260520001736.0 | ||
| 008 | 260224s2008 xxu | ||
| 245 | 0 | 0 |
_aOptimize LNG plant reliability _bControlling heat exchanger cool-down increases efficiency and availability |
| 260 |
_a _b _cJul. 2008 |
||
| 270 | _a11/08/2008 ; 11/08/2008 | ||
| 300 | _a2 p. ; 67-69 | ||
| 581 | _a7 | ||
| 773 | 0 |
_tHydrocarbon Processing _g87 |
|
| 942 | _cARTICULO | ||
| 100 | 1 |
_aParra, M. _939971 |
|
| 100 | 1 |
_aBeeby, C. _939972 |
|
| 999 |
_c168658 _d168658 |
||