| 000 | 00586nab a2200181 4500 | ||
|---|---|---|---|
| 005 | 20260520001730.0 | ||
| 008 | 260224s2008 xxu | ||
| 245 | 0 | 0 | _aLubrication process at the wall in foam flow - Application to pressure drop estimation while drilling UBD wells |
| 260 |
_a _b _cJun. 2008 |
||
| 270 | _a10/06/2008 ; 10/06/2008 | ||
| 300 | _a4 p. ; 26-30 | ||
| 581 | _a6 | ||
| 773 | 0 |
_tJournal of Canadian Petroleum Technology _g47 |
|
| 942 | _cARTICULO | ||
| 100 | 1 |
_aPeysson, Y. _933443 |
|
| 100 | 1 |
_aHerzhaft, B. _912653 |
|
| 999 |
_c168361 _d168361 |
||