| 000 | 00570nab a2200181 4500 | ||
|---|---|---|---|
| 005 | 20260520000750.0 | ||
| 008 | 260224s2007 xxu | ||
| 245 | 0 | 0 |
_aOperator tests limits of coiled tubing drilling _bWith 1.000 wells to drill, BP set out to prove that coiled tubing drilling (CTD) wasn't a pipe dream |
| 260 | _cmarzo. 2007 | ||
| 270 | _a23/04/2008 ; 23/04/2008 | ||
| 300 | _a2 p. ; 37-38 | ||
| 581 | _a3 | ||
| 700 |
_aO'Leary _939464 |
||
| 700 | 1 |
_aPink, Tony _939465 |
|
| 773 | 0 |
_tE & P _g80 |
|
| 942 | _cARTICULO | ||
| 999 |
_c168009 _d168009 |
||