| 000 | 00639nab a2200181 4500 | ||
|---|---|---|---|
| 005 | 20260520001723.0 | ||
| 008 | 260224s2007 xxu | ||
| 245 | 0 | 0 |
_aIntegrate HSE concepts in facility design _bIncorporating these aspects early in the planning process significantly reduces rework and subsequent costs during construction and operation |
| 260 |
_a _b _cDic. 2007 |
||
| 270 | _a11/04/2008 ; 11/04/2008 | ||
| 300 | _a3 p. ; 43-46 | ||
| 581 | _a12 | ||
| 773 | 0 |
_tHydrocarbon Processing _g86 |
|
| 942 | _cARTICULO | ||
| 700 | 1 |
_aKralik, N. _939160 |
|
| 700 | 1 |
_aPorter, L. _939161 |
|
| 999 |
_c167659 _d167659 |
||