| 000 | 00650nab a2200193 4500 | ||
|---|---|---|---|
| 005 | 20260520003833.0 | ||
| 008 | 260224s xxu | ||
| 245 | 0 | 0 | _aPCM data interpretation is challenging in multi-pipe configurations |
| 270 | _a12/09/06 ; 07/07/2005 | ||
| 300 | _a2 p. | ||
| 773 | 0 |
_tPipeline and Gas Journal _gVol. 232, no. 6 (jun. 2005) ; p. 51-52 |
|
| 942 | _cARTICULO | ||
| 100 | 1 |
_aPerich, Wayne E. _936941 |
|
| 100 | 1 |
_aOostendorp, Dirk L. van _925628 |
|
| 650 | 0 |
_aCorrosión en gasoductos _9138 |
|
| 650 | 0 |
_aControl de la corrosión _93054 |
|
| 700 | 1 |
_aOostendorp, Dirk L. van _925628 |
|
| 999 |
_c165504 _d165504 |
||