000 02033nmc a2200217 4500
005 20260520005830.0
008 260224s xxu
082 _aCD I249 1 0013788
245 0 0 _aPlant Aging and Life Extension Program at Arun LNG Plant Lhokseumawe , North Aceh , Indonesia
270 _a12/09/06 ; 22/07/2003
300 _a13 p.
500 _aDisponible en CD en formato PDF
520 _aTranscripción del abstract original del autor: The paper discussed the detail process of plant aging study and life extension remedial action plans. By doing the right thing right from the beginning (design, construction and commissioning), operation, maintenance and engineering support to the Plant Facilities and consistently applied will lead to the safe operation and reliable performance. By applying the mentioned study, Arun LNG Plant facilities has been operated for 25 years and has delivered 3750 cargoes of LNG to buyers safely and reliably. Hopefully, the plant can also be operated safely and reliably throughout the remaining of the plant life. Comprehensive reconditioning to the Sea water coolers that has been carried-out in a good manner shows that damaging effects of sea water can be minimized and controlled to reduce downtime and extend the equipment life. CUI is a dangerous hidden destructive force that must be careful monitored. When CUI becomes acute, serious catastrophic failures can result. CUI is best prevented by proper initial application of protective coatings to equipment and pipe that are located close to the sea shore or in location subject to heavy humidity. In addition, care must be taken to ensure insulation is properly installed and that any damaged areas are quickly identified and repaired.
773 _g
942 _cCONGTP
100 1 _aSukamto
_922650
110 2 _aInternational Gas Union, IGU
_913105
111 2 _aWorld Gas Conference (22nd. : 2003 jun 1-5 : Tokyo)
_922029
710 2 _aInternational Gas Union, IGU
_913105
999 _c150012
_d150012