000 01624nmc a2200205 4500
005 20260520005827.0
008 260224s xxu
082 _aCD I249 1 0013788
245 0 0 _aEvolution of "asset management" at Badak LPG plant, Bontang Indonesia
270 _a07/09/06 ; 22/07/2003
300 _a11 p.
500 _aDisponible en CD en formato PDF
520 _aTranscripción del abstract original del autor: PT Badak is meeting the challenges of the LNG market, by significantly increasing its available spare capacity at the Bontang LNG Plant. To realize its vision, PT Badak formed the inter Departmental Reliability Improvement Team (RIT) in 1996. The team identifies the reliability issues, prioritizes the issues, makes plans for reliability improvement to eliminate each reliability issue, and monitors the implementation of each action plan. The LNG losses due to problems with the Multi Component Refrigerant (MCR) Compressor, gas-treating unit, MCR inter after cooler, and the Cooling water distribution problems (Surface condenser leaks and Scaling problems) have been significantly reduced .As a result, the production increases and up time availability have improved from 90 to over 96 %, a world class level. This paper will attempt to share the lessons PT Badak has learned in improving the reliability strategy of Asset Management.
773 _g
942 _cCONGTP
110 2 _aInternational Gas Union, IGU
_913105
111 2 _aWorld Gas Conference (22nd. : 2003 jun 1-5 : Tokyo)
_922029
710 2 _aInternational Gas Union, IGU
_913105
999 _c149876
_d149876