000 01714nmc a2200217 4500
005 20260520005824.0
008 260224s xxu
082 _aCD I249 1 0013788
245 0 0 _aEffecto of simulation works to cost reduction in the gas storage process
270 _a12/09/06 ; 22/07/2003
300 _a14 p.
500 _aDisponible en CD en formato PDF
520 _aTranscripción del abstract original del autor: The aim of this work is to show possibilities of how the simulation results may be used not only as an instrument for reservoir engineering, but also as an important cost reduction factor. Nafta a.s., Gbely has thirty years’ experience with natural gas storage. This work deals with cost reduction at three levels - past, present and future. The first level compares actual underground gas storage (UGS) building and development in Nafta a.s., Gbely from early Seventies with the possible UGS building using modern methods. The second level describes the present utilisation of the simulation works in Nafta a.s., Gbely and the third level describes the possibilities of the prospective simulation. This work can be a source of information for UGS developing companies. This work does not intend to introduce any new instrument to the gas industry, but uncovers and summarises the potential, sometimes neglected aspects, of such a state of the art instrument as reservoir simulation.
773 _g
942 _cCONGTP
100 1 _aLevoca, Jozef
_922367
110 2 _aInternational Gas Union, IGU
_913105
111 2 _aWorld Gas Conference (22nd. : 2003 jun 1-5 : Tokyo)
_922029
710 2 _aInternational Gas Union, IGU
_913105
999 _c149725
_d149725