000 01775nmc a2200241 4500
005 20260520005822.0
008 260224s xxu
082 _aCD I249 1 0013788
100 1 _aJung, Man-Jin
_922282
100 1 _aCho, Joseph H.
_922283
110 2 _aInternational Gas Union, IGU
_913105
111 2 _aWorld Gas Conference (22nd. : 2003 jun 1-5 : Tokyo)
_922029
245 0 0 _aLNG terminal design feedback from operator's practical improvement
270 _a12/09/06 ; 22/07/2003
300 _a14 p.
500 _aDisponible en CD en formato PDF
520 _aTranscripción del abstract original del autor: Considerable efforts for reducing the operation and construction costs of Liquefied Natural Gas (LNG) facilities have been invested in for decades. Unlike in other industries, so far LNG terminal operators' design feedbacks in terminal design have inactively limited compared to their important roles in an LNG chain. This paper presents the practical design improvements against the conventional design problems occurred unexpectedly during terminal operation and maintenance. These involve boil-off gas treatment, sendout pressure control, LNG unloading, and vapor return. The reliability analysis of main equipment is also presented for estimating the terminal sendout availability based on the actual operation and maintenance rates. This study provides an operator's feedback accumulated from the experience in operation and maintenance not only for other terminal operators, but also for design engineers who make every effort to contribute to a better LNG terminal design.
700 1 _aCho, Joseph H.
_922283
710 2 _aInternational Gas Union, IGU
_913105
773 _g
942 _cCONGTP
999 _c149660
_d149660