245 0 0 _aBlue stream ready for gas transportation
270 _a12/09/06 ; 22/07/2003
300 _a16 p.
500 _aDisponible en CD en formato PDF
520 _aTranscripción del abstract original del autor: This paper presents and details the Blue Stream project through the various phases for the section managed by BSPC (Blue Stream Pipeline Company BV), from the very beginning to its conclusion, with deep analyses of main features and characteristics as well as the various challenging matters faced and overcome, opening a new frontier for the laying of pipelines in deep water. The project consists of three main segments: the onshore section in the Russian territory from Stavropol to the Black Sea coast controlled by Gazprom, the section of BSPC to cross the Black Sea and the onshore part in the Turkish territory from Samsun to Ankara managed by Botas. The BSPC part consists respectively of one Compressor Station in Beregovaya close to the Russian coast on the Black Sea and two offshore pipelines of 24" Nominal Diameter at the world's record depth of 2,150 m. The Offshore Section was realised laying the pipelines both with standard S-Lay mode in shallow waters and with the innovative J-Lay method for the main part of the routes. J-Lay was executed through the Saipem 7000 (S7000) vessel, custom modified for the purpose. Various technical difficulties had to be solved, such as the geohazard in the Russian steep slope, the presence of H2S in the seawater and the laying at very deep water. The project is ready for the first gas flow from Russia to Turkish market and the first gas flow occurred at the beginning of year 2002.
710 2 _aInternational Gas Union, IGU
_913105
942 _cCONGTP
_2ddc
999 _c149521
_d149521