000 01678nmc a2200229 4500
005 20260520005648.0
008 260224s xxu
082 _aCD W938 1 0013960
210 _aWPC (16th.)
245 0 0 _aDYNAMIC STABILITY OF DRILLING PROCESS IN BASEMENT OF WHITE TIGER AND DRAGON OILFIELDS IN VIETNAM
270 _a12/09/06 ; 26/08/2003
300 _a2 p.
520 _aResumen del autor, extraído del trabajo. There were more than 200 wells drilled in basement of White Tiger and Dragon Oilfields in Vietnam. These wells were drilled in complicated geological conditions: - high depth of the basement; - high hardness (VII- VIII category Strength) and abrasiveness (V- VI class) of formation; - 3D space disposition of cracks and fault in basement; - low formation pressure: 0.83-0.93 of hydraustatic pressure, severity lost circulation. On data of the last years more than 60 % of wells drilled by the known petroleum companies on these oil field does not hit target circle ("Sedco Forex" -USA, “Sakhalinmomeftegas-Rosneft", Russia, joint venture “VietSovPetro" etc...) In this paper, based on modern engineering calculations, laboratory researches and experiments authors offer new engineering solution ensuring dynamic stability of drilling process in the basement and reaching the designs targets.
773 _gv. 2, p. 338-339
942 _cCONGTP
100 1 _aChirine-Zade, S.A.
_99676
100 1 _aDao, Tran Zuan
_99677
111 2 _aWorld Petroleum Congress (16th. : 2000 jun. 11-15 : Calgary, Alberta, Canada)
_934
700 1 _aDao, Tran Zuan
_99677
800 1 _aChirine-Zade, S.A.
_99676
999 _c133491
_d133491