000 01373nmc a2200277 4500
005 20260520005647.0
008 260224s xxu
082 _aCD W938 1 0013960
210 _aWPC (16th.)
245 0 0 _aSamotlor oilfield model building
270 _a12/09/06 ; 26/08/2003
300 _a2 p.
520 _aResumen del autor, extraído del trabajo. Samotlor is the biggest multi pay zone oil field in Russia. It is situated in West Siberia. Production started in the 1960s and now the oil field is in a late stage of development. The economic situation demands a decrease in the cost of residual reserve recovery. To solve this problem in a short time is realized the unique project geological structure and hydrodynamic analysis revision on the base of 15000 wells. In the paper will be covered the experience of project management and geological/technological results
773 _gv. 2, p. 308
942 _cCONGTP
100 1 _aDenisov, S.B.
_99640
100 1 _aBokserman, A.A.
_99641
100 1 _aBrezitskiy, S.V.
_99642
100 1 _aDjafarov, I.S.
_99643
111 2 _aWorld Petroleum Congress (16th. : 2000 jun. 11-15 : Calgary, Alberta, Canada)
_934
700 1 _aBokserman, A.A.
_99641
700 1 _aBrezitskiy, S.V.
_99642
700 1 _aDjafarov, I.S.
_99643
800 1 _aDenisov, S.B.
_99640
999 _c133480
_d133480