000 02261nmc a2200469 4500
005 20260520005600.0
008 260224s2001 xxu ing
041 _aInglés
245 0 0 _aUse of Coiled-Tubing on Production Wells Located in the San Jorge Basin
_bSPE 69409
260 _aDallas, Texas
_bSociety of Petroleum Engineers
_c2001
270 _a12/09/06 ; 05/10/01
520 _aIn the continuous search of the optimization of investments and the reduction of operative costs, Repsol-YPF decided to research the possibility of the use of Coiled Tubing to produce traditional diameter wells at the Golfo San Jorge Basin. This represents a further step after an experience undertaken in reduced diameters started in 1997 1 . Through this new experience it was proven that it is posible to produce wells with diameters higher than 3.5 in. Using coiled tubing in mechanical pumping, generating at the same time new possiblilities for coiled tubing with other artificial lift systems.
942 _cCONGTP
100 1 _aZurita, D.N.
_95809
100 1 _aAbella, F.J.
_95810
100 1 _aLuongo, S.
_95811
100 1 _aMaino, J.C.
_95812
100 1 _aMontenegro, E.M.
_95813
100 1 _aPanza, L.A.
_95814
100 1 _aLopez, R.E.
_95815
100 1 _aSequra, H.R.
_95816
100 1 _aRomero, V.M.
_95817
100 1 _aGómez Cavieres, G.E.
_95818
100 1 _aHomes, A.H.
_95819
100 1 _aRomero, E.O.
_95820
111 2 _aLatin American and Caribbean Petroleum Engineering Conference (7th : 2001 mar. 25-28 : Buenos Aires, Argentina)
_95738
700 1 _aAbella, F.J.
_95810
700 1 _aLuongo, S.
_95811
700 1 _aMaino, J.C.
_95812
700 1 _aMontenegro, E.M.
_95813
700 1 _aPanza, L.A.
_95814
700 1 _aLopez, R.E.
_95815
700 1 _aSequra, H.R.
_95816
700 1 _aRomero, V.M.
_95817
700 1 _aGómez Cavieres, G.E.
_95818
700 1 _aHomes, A.H.
_95819
700 1 _aRomero, E.O.
_95820
711 2 _aLatin American and Caribbean Petroleum Engineering Conference (7th : 2001 mar. 25-28 : Buenos Aires, Argentina)
_95738
800 1 _aZurita, D.N.
_95809
999 _c130855
_d130855
856 _uhttps://biblioteca.iapg.org.ar/ArchivosAdjuntos/LACPEC2001/Spe69409.pdf